During the design meeting, our head design leader, Eugene, basically showed us in ten minutes how to build a schoolhouse. Of course, there's definitely more calculations and work so there will be a Design Day this Friday at 12 PM. Anyone wanting to help and willing to learn can come even without a structural engineering background. They will be meeting in front of Boelter Hall in the Court of Sciences. There are two designs for the schoolhouse: one with plywood available and one without plywood available. The alternative of not having plywood would cause more difficulties in design and gathering material and would be more costly.
In our regular meeting, Oren reminded us of the deadlines approaching. There is a great need for us to raise money because without the money we cannot begin construction of the schoolhouse. Therefore, everyone is to bring the name of a foundation with a grant to next week's meeting.
Another issue raised was that the foundation would probably be exposed for a long time (possibly even a year) and because the soil is mostly clay, we need to find ways to build the foundation to last during the wait between visits. Two solutions that were discussed were to either build a bigger foundation or to transport gravel or sand from another location to place the foundation on top of (the gravel or sand will allow water to drain).
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment