Sunday, September 27, 2009

From design to reality (with some variations inbetween):

Saturday, September 26, 2009

Step-by-step construction process for Composting Latrines in the San Sebastian of Kukra River in Nicaragua:

1) Leveling the ground for our foundation


2) Cutting rebar for reinforcements on top and base slabs as well as vertical corner reinforcement for vaults. Wood was also cut for base slab's form at this stage of the process.


3) Arranging rebar and tying with wire to measured dimensions


4) Hammering together the form for the bottom slab, filling it with rocks to approximately half the height, then placing the rebar frame on top


5) Using the volcanoe method for mixing concrete (aggregate was added after water, cement, and sand were mixed)


6) Layering on concrete for bottom slab


7) Once dry enough (approximately a day), prefabricated blocks shipped in from Bluefields were stacked layer by layer while being cemented together. Rebar propped up at the corners. Note how two gaps were left in the back. These will provide access into the vaults. Separate concrete slabs with handle bars on them will be cemented into place with a 1" clearance that is to be filled in by paper or plastic bags and is chissled out at the time of removal.


8) Wooden planks were hammered into concrete to cover the tops of both chambers in order to provide a backing for the top slab's concrete form. Toilet holes made from sheets of zinc and nailed in around the outside into the planks. Rebar reinforcement was also used for this slab.


9) Top slab being filled in with concrete


10) Once base is completed, a wooden superstructure was built. This process took longer than expected so beware! We started out with a frame made of 2x4's and used planks placed in the horizontal direction. The corrugated Zinc was attached using roofing nails


11) The steps were (unfortunately) made after the concrete vault was created, as we were unsure at the time on how much concrete would be left over. In the future, the concrete steps would be taken into account when designing the base slab.


12) Fly ventilation was placed on the side. We had initially designed for the vent to be placed along the backwall which would have been designed to have access into both chambers, however lack of communication led to a modified design by the mason, where the top row of blocks in the divider is spaced approximately 1/2" between each block to allow for ventilation and fly passage from the vault that is not directly connected to the vent. We will see the effectiveness when we return to the area. Another issue we had was the fact that gray vent pipes were provided for us instead of white. This may end up having an effect on the number of flies able to be effectively removed from the latrine.


The end result. Due to a scarcity in toilet casts, the toilets for these latrines were unable to come in time. In addition to this, we also ran out of time for the assembly of the door. We anticipate receiving photos and updates from our onsite NGO affiliates, FUNCOS, who will inform us whether or not all has been completed. In the mean time, here is a photo of us and all those who helped (including the entire family):

Monday, September 7, 2009

Hello from Bluefields!

We have finally received approval from the Technical Advisory Committee and tomorrow, September 9th, we shall venture in to the kukra river region to begin the implementation phase of our project. Designs have changed dramatically over the months but we have finally sorted out a lot of the confusion. we will be using a ´T´pvc piece for the top part of the ventilation (as that was what was available at the hardware store) and there will be no separated urinal diverter. All three of the latrines will be quite similar in structure, except for one which will include a pvc ventilation system. Additionally, one or two of the latrines´staircases will be made of wood so as to cut down on costs (and because wood is quite abundant within the area).

Materials have already been gathered and a mason has also been hired so as to ensure the success of this project. Also, as a side note, the toilets are being purchased ahead of time as opposed to being made from a cast. this will cut down on time and cost. Pictures of the construction and final results will be posted in a few weeks!

Wednesday, July 22, 2009

After an intense interview with the Technical Advisory Committee, we were told that in order to be approved for our pilot phase trip in September, we will need to produce a safety and health plan, a site plan (which shows the relative distances of our latrines to any water sources), and a foundation plan. On top of this, we were told to perform a concrete construction lab, which we completed last Thursday with Warren and I, along with the help of Chelsea from ASCE and my friend, Shannon. We will also be performing this lab again tomorrow with our Mentor, Tim, Karen, and possibly Amanda and Bart.

Also, one big thing that was suggested by the committee was that we may want to consider clear or light colored plastic roofing as opposed to the traditional zinc. Though this may considerably detract from the overall task of fly removal (by not being able to provide an appropriate gradient in brightness for which the flies can follow), it will (perhaps more importantly) increase the user friendliness as well as provide visibility that may prove highly desirable from a health standpoint in certain circumstances. If we do not go with this alternative, it is suggested that the recipients will be more likely to transform their latrine into a storage unit or some other form of alternative usage.

Monday, June 22, 2009

So we had our interview with Tiffany from the National Chapter of EWB on wednesday and discussed our site assessment trip back in March. One of the key things to take from this interview was the necessity for having a written agreement between our group and the recipient families of the composting latrines. This serves both as a means of solidifying a commitment from the families and also as a clarification for them on what our scope is for this project.

Our pre-implementation papers have been sent in and we will be expecting a TAC review within the next few weeks to discuss our trip, which is scheduled for mid September.

Saturday, June 13, 2009

During our assessment trip back in March, Tim, Warren, and I had a conversation with Leonel Luna, The president of FUNCOS. He told us that in addition to the obvious need for sanitation improvement within the area, there was also the potential for hydroelectric dam construction that would be used to power Kukra River, which currently has no source of electricity. Since then, Hannah Lawrence, Hagan O'Connor, and myself (Julia Pasternack) have performed a fairly detailed analysis on the feasibility of such an undertaking for our UCLA senior design project. The outcomes revealed that for optimum efficiency and under the fairly low head and flow conditions, a kaplan turbine with a synchronous AC generator mounted via a directly coupling shaft would be the optimum choice. Our resultant poster is provided below. However, it should be noted that further analysis will indeed be pursued by both UCLA students as well as correspondents in Nicaragua.

Thursday, May 28, 2009

Hey everyone! Sorry for the delay in updates. Currently we still need to hear back from the national chapter for their review of our assessment trip. If all goes well, we will be able to perform a pilot phase implementation trip in September, where we will be installing three (possibly four)composting latrines of varying designs in the Kukra River community of San Sebastian. These designs will help us in figuring out the optimum cost, and reliability, output product (fertilizer) among many other factors. Here are some rough designs that that we have come up with thus far. Many modifications will take place between now and September.





courtesy of James Chen


our trip will serve both as an assessment trip for the possible installation of roof water-catchment systems and as a pilot phase for our sanitation latrine construction project. For the pilot phase, we will be constructing three (possibly four, depending on the amount of funding that we acquire) composting latrines within the community of San Sebastian and along the outskirts of Las Brenas. All designs will be double-vault composting latrines of relatively similar size. Design #1 will be a simple, minimal cost design that is similar to the nearby composting latrines in the Kukra River Region. The main difference, however, lies in having a wooden staircase as opposed to cement.
The second design will be built partially in ground, utilizing the structural support provided by the earth in order to maximize the given volume. This latrine will have a cement staircase with a cement slab along one of the steps that can open up and serve as an opening for weekly stirring of the mixture as well as the annual removal of the compost. Such a design will essentially eliminate the issue of fecal contamination around the toilet seat area that could pose a potential problem during the typical practice of stirring through the toilet hole. This model will also be equipped with a zinc superstructure, which isn’t as widespread of a material choice as wood, however it has been used with a few of the latrines in the region.

The third design will implement an added section in the back that, again, seeks to maximize the volume below the latrine while still seeking to maintain both cost and effectiveness in the composting process. The area will have a slanted top face that contains a metal door which can open and close to allow for easy stirring and removal of fecal matter. The choice of metal is an attempt to speed up the anaerobic breakdown of the fecal matter through heating while also serving as a structurally robust moving component in our design. The staircase for this design will be wooden. This design will be constructed for one of our larger selected families that live on the outskirts of Las Brenas.

The potential fourth design will be quite similar to that of the third design with the exception of a more permanent, cement staircase and an additional ventilation system via PVC piping. Such a feature has the potential for helping to facilitate the anaerobic process within the fecal matter as well as reducing the instances of flies and negative odors. Ideally, this design will be constructed for the new schoolhouse that is to be constructed in San Sebastian (via financial support from the Catholic Church). Since such construction is still underway, this design is likewise still up in the air. During the assessment trip, we were assured by one of the teachers at the preexisting school that there would be members of the community that would be willing to take on the task of compost upkeep and removal, as ownership of a latrine in such an environment is quite different than with families.