Monday, September 7, 2009

Hello from Bluefields!

We have finally received approval from the Technical Advisory Committee and tomorrow, September 9th, we shall venture in to the kukra river region to begin the implementation phase of our project. Designs have changed dramatically over the months but we have finally sorted out a lot of the confusion. we will be using a ´T´pvc piece for the top part of the ventilation (as that was what was available at the hardware store) and there will be no separated urinal diverter. All three of the latrines will be quite similar in structure, except for one which will include a pvc ventilation system. Additionally, one or two of the latrines´staircases will be made of wood so as to cut down on costs (and because wood is quite abundant within the area).

Materials have already been gathered and a mason has also been hired so as to ensure the success of this project. Also, as a side note, the toilets are being purchased ahead of time as opposed to being made from a cast. this will cut down on time and cost. Pictures of the construction and final results will be posted in a few weeks!

No comments:

Post a Comment